Pump Calculation Excel — Booster

Cell A10: Elevation (m) = 25 Cell B10: Friction Loss (m) = Calculate per 2.2 below Cell C10: P_discharge (bar) = 4.0 Cell D10: P_suction (bar) = 2.5 Cell E10: TDH (m) = A10 + B10 + (C10 - D10)*10.2 This is where Excel shines for iterative design.

Download a template or build one using the formulas above. Test it against a known installed pump. Refine it with your local pipe material data. Then use it on every project. Have you built your own pump sizing spreadsheet? What’s the most useful feature you’ve added? Let’s discuss in the comments.

NPSHa = (D10*10.2) - 0.34 - H_friction_suction Condition: NPSHa must be > NPSHr (from pump curve) by at least 0.5 m. Once you have TDH and Q, calculate hydraulic, shaft, and motor power. booster pump calculation excel

| Parameter | Unit | Description | Typical Value | | :--- | :--- | :--- | :--- | | Flow Rate (Q) | m³/h or GPM | Peak demand (fixture units, sprinkler heads, etc.) | Variable | | Suction Pressure (P_suction) | bar or psi | Pressure available at pump inlet (from city main or tank) | 2.5 bar | | Required Discharge Pressure (P_discharge) | bar or psi | Pressure needed at the highest/farthest fixture | 4.0 bar | | Elevation Difference (H_geo) | m or ft | Vertical distance from pump to highest point | 25 m | | Pipe Length (L) | m | Total length of the longest run | 150 m | | Pipe Diameter (D) | mm or in | Nominal bore | 80 mm | | Friction Factor (f) | dimensionless | Darcy-Weisbach or Hazen-Williams C-factor | 0.02 (or C=130) |

In this post, I’ll break down the key calculations every booster pump sizing spreadsheet must include, complete with formulas and logic. Your Excel sheet should start with a clear Input tab. Without accurate data, the best formulas are useless. Cell A10: Elevation (m) = 25 Cell B10:

| Output Parameter | Value | Unit | Status | | :--- | :--- | :--- | :--- | | Total Dynamic Head | 52.3 | m | ✅ OK | | Flow Rate | 50 | m³/h | ✅ OK | | NPSHa | 4.2 | m | ✅ > NPSHr (3.7 m) | | Required Motor Power | 11 | kW | Select 11 kW / 15 HP | | Velocity | 2.1 | m/s | ⚠️ High (limit 2.0 m/s) |

| Parameter | Formula | Excel Example | | :--- | :--- | :--- | | Hydraulic Power (P_h) | Q (m³/s) * TDH (m) * ρ * g | = (Q_m3h/3600) * TDH * 1000 * 9.81 | | Shaft Power (P_s) | P_h / Pump Efficiency (η_p) | = P_h / 0.75 (for 75% efficiency) | | Motor Power (P_m) | P_s / Motor Efficiency (η_m) | = P_s / 0.92 | Refine it with your local pipe material data

NPSHa = P_suction*10.2 - H_vapour - H_suction_friction